Musandam Gas Plant

PROJECT DETAILS

Client : L&T Electromech LLC
EPCC Contractor : Hyundai E&C LLC
Owner : Oman Oil Company SAOG
Owner’s Engineer : Hyundai E&C LLC
Scope : Fabrication, Erection & Hydro testing of GRE, GRP systems

Scope of Work

  •  GRE DN 50 mm To DN 700 mm.
  • GRE Pipe Erection, Fabrication, Hydro test.
  • Valve Installation.
  •  Lamination and key lock joints.
  • Fire fighting System, Closed Drain Line System. Oil waste Service System.